- Air Purification Systems
- Geothermal SystemsAccording to consulting engineer Don Penn, P.E. of Grapevine, Texas, “LBJ MS is the first school utilizing geothermal systems in the district, and the owner has been impressed with the geothermal system installed at this campus.” Assistant Superintendent for Support Services of the Irving Independent School District Scott Layne reported that the environmental comfort system is well- balanced and provides constant temperature throughout the campus buildings.
- Duct WorkDue to necessary technical requirements and strict industry regulations, hospital operating rooms are traditionally complicated to design and build. Proper airflow and lighting position to limit shadows and regulate temperature during procedures are a primary concern. For this specific project, the scope included an even greater challenge: The hospital was converting a space previously used to store sterile equipment into a new operating room. The Texas AirSystems team was tasked with finding a way to include all necessary ductwork and components in a prebuilt and crowded ceiling space.